Refurbishment Of Tank TK-610, HEFT Terminal

  1. Design calculations for tank lifting using external jacks.
  2. Lifting of tank using external jacks after isolating the tank.
  3. Cutting & replacement of bottom plates, annular plates, center sump.
  4. Includes, supply, fabrication, installation, welding, NDT, blasting & painting.
  5. Replacement of existing soil with Clean washed Silica sand
  6. Replacement of HDPE liner
  7. Replacement of IFR seal
  8. Design, supply, installation & integration of Cathodic Protection system
  9. Design, supply & installation of VPCI system
  10. Hydrotest of tank
  11. Tank calibration, Radar Gauge calibration.