CFU Flash Drum Project

project details

Client: VTTI FUJAIRAH TERMINALS LIMITED FZC
Client Location: Fujairah, UAE
Start: Sep-2023
End: Jun-2024

Brochure

Download our document to see specific data of the service and how we work.

COMPANY PROFILE

CFU Flash Drum Project

  1. Design, manufacturing, Testing, Painting & installation of a new flash drum in VTTI CFU unit.
  2. Structural adequacy analysis of existing CFU structure and necessary modification of structure for accommodating the new CFU Flash drum.
  3. Installation of 4 Nos new pumps including civil foundation design and construction.
  4. Associated process piping works and Electrical & Instrumentation works.
  5. Modification of existing piping and rerouting works for accommodating new piping associated with this project.
  6. Rerouting of underground Firewater HDPE line, other utility lines and associated civil works.
Open chat
Welcome to HiapSeng Engineering