Project

Fire Water Tank

Engineering, Material Supply, Installation, Testing and Commissioning of the Fire Water Tank system at VTTI Terminal, Fujairah.

The scope of work includes fabrication, erection, of FW Tanks with associated civil, structural, mechanical, piping, fire fighting, insulation, electrical and instrumentation works.

Project details
Client VTTI FUJAIRAH TERMINALS LIMITED FZC
Location Fujairah, UAE