Project

Mount Row Terminal Expansion Project

Engineering, Procurement, Construction and Commissioning (EPCC) of the Storage Terminal with the following major equipment / packages.

  • Product Storage Tanks of various Dia. & Height, of total 20 nos. with utility Tanks of 3 nos.
  • Jetty pipelines of about 1.5 km each of 36” x 1 nos, 28” x 3 nos, 8” x 1 nos.
  • Product Pumps
  • Firewater pumps and other firefighting equipment
  • Existing Nitrogen package Refurbishment.
  • Various Buildings viz: Workshop, Substation, VFD Building together etc.
  • Structural Buildings / Sheds viz: Pump and Valve Manifold, Nitrogen package Shed, etc.
  • Complete civil infrastructure including roads, drainage, pavements etc.
  • Electrical System including 33kV Switchgear, DG, and all related services.
  • Terminal Automation System, Control and communication system etc.

Scope covers, detailed engineering, procurement and supply of materials, fabrication, installation, erection, testing, pre-commissioning, commissioning of the Storage Terminal and associated facilities. The facility includes buildings (substation, admin / control buildings, pump shelters etc), storage tanks, civil works, pipeline, piping, electrical works, control and automation systems.

Project details
Client Mount row Terminal (USA)
Client Location Fujairah, UAE
Date Start: 2026 End: Ongoing